Workspace
Everything your team uploads, maps and analyses lives in this workspace. Each upload is kept as its own version, so every number traces back to a file and a row.
Datasets
Newest first| Dataset | Source | Rows | Data quality | Status |
|---|---|---|---|---|
| Production · Jul–Sep 2026 v2 · uploaded by Plant Manager | mes_export_q3.csv | 1,548 | 92 / 100 | Analysed |
| Production · Jun 2026 v1 · Insight One template | insight-one-template.xlsx | 512 | 97 / 100 | Archived |
MES export · 11 columns
Applied automatically the next time a file with the same columns arrives.
Day 8 h · Evening 7.5 h
Used when a file does not include available hours.
1 admin · 2 analysts
Roles: Admin, Analyst, Viewer.
Upload production data
Use the Insight One template, or upload the file you already have. You do not need to change your systems or rename columns.
Fill in the template
Fifteen standard fields, five of them required. Columns match automatically, so there is nothing to map.
Upload your own file
An ERP, MES or timesheet export, or a spreadsheet. Insight One suggests how each column maps, and you confirm.
Map your columns
Each of your columns is matched to a standard Insight One field. Confident matches are pre-filled. Check the rest, then confirm.
| Your column | Example | Insight One field | Match | Unit |
|---|
Other plants name the same things differently
These all become the same field, so one analysis works for every plant.
Check data quality
Before any analysis, every row is checked. Rows with errors are set aside. Rows with warnings are kept and flagged, so you can see exactly what the results rest on.
Data Quality Score: Good
Good enough to analyse now. Fixing the warnings below makes the downtime analysis sharper.
What was found
1,548 rows · 0 errors · 13 warningsRows are kept. Their downtime is counted, but cannot be grouped by cause.
Utilization is based on run time. Add setup time to see changeover losses separately.
Enough for capacity analysis and a first forecast. 26 weeks or more makes the forecast range tighter.
Every work center logs 24 hours or less per day, and run time plus downtime stays within available time.
Capacity & constraints
Utilization by work center
Downtime by cause
hours, all work centersDowntime trend
Forecast load vs capacity
Bars show the expected load. The thin range shows where the load is likely to land. Weeks above the dashed line need more capacity, less work or a decision.
What if…?
Test a change before you make it. Each option re-runs the 8-week plan for the constrained cell.
Export results
Take the results into a meeting, Power BI or your own reports. Exports contain your numbers and findings. They do not contain Insight One's calculation logic.
See this on your own data
A Manufacturing Data Assessment runs your existing exports through this workflow and walks your team through the results.